PUWER 1998 — Regulations 4 to 10

Click here to leave us a Google review

PUWER Machinery Inspections in Nottingham

Independent machinery safety inspections of CNC, workshop and production equipment — guarding, emergency stops, controls, isolation and condition, with a risk-based schedule you can defend.

Request a PUWER quote Call 07971 571 275

At a glance

Interval
Risk based
Typical workshop
Annually
Second-hand plant
Before use
Report
Same day

What PUWER requires of you

The Provision and Use of Work Equipment Regulations 1998 apply to every piece of work equipment on your site — from a bench grinder to a production line. The duty is broad: equipment must be suitable for the job, safe to use, properly maintained, adequately guarded, fitted with accessible stop and isolation controls, and used only by people who have been trained and informed.

Unlike LOLER, PUWER sets no fixed interval. Regulation 6 requires inspection where the safety of the equipment depends on how it was installed or the conditions it works in, at intervals you can justify. That flexibility is where most businesses come unstuck: an inspector will ask what your interval is based on, and a documented, risk-based schedule is the answer.

Machinery we inspect

CNC machines

Mills, lathes, routers

Lathes & milling machines

Manual workshop plant

Pillar drills

Guarding & chuck keys

Bandsaws & circular saws

Blade guarding

Woodworking machinery

Planers, spindle moulders

Presses & guillotines

Two-hand control, light guards

Grinders & linishers

Wheel condition, rests

Production lines

Interlocks & guarding

Conveyors

Nip points & trip wires

Compactors & balers

Interlocked access

Mixers & mills

Access & isolation

General work equipment

Anything powered on site

What gets checked

  • 01Fixed and interlocked guarding — present, secure, and not defeated or bypassed.
  • 02Emergency stops and trip devices for accessibility, function and correct latching.
  • 03Start controls, hold-to-run and two-hand controls for correct and safe operation.
  • 04Isolation and lock-off provision, including local isolators and residual energy.
  • 05Mechanical condition — bearings, drives, belts, chains and structural security.
  • 06Electrical enclosures, glands and cable condition for damage and unauthorised access.
  • 07Warning markings, instructions and CE/UKCA documentation where it should be present.
  • 08Operator training records, safe operating procedures and maintenance history.

Setting an interval you can justify

Situation Typical approach
General workshop machineryAnnual inspection
High-risk or heavily used plantSix-monthly or shorter
Second-hand or imported machineryBefore first use
Relocated or re-installed equipmentAfter installation
After modification, damage or long lay-upBefore returning to service

What you receive

Written inspection report

Each machine listed with findings, a clear compliance status, and photographs of anything significant.

Prioritised action list

Defects ranked so you can deal with the dangerous items today and the housekeeping over the month.

Recommended interval

A justified inspection frequency per machine, based on its risk and how hard it works.

Evidence for auditors

Documentation that answers the inspector’s question: how do you know this machine is safe?

PUWER questions

Is PUWER a legal requirement?

Yes. PUWER 1998 places duties on employers to ensure work equipment is suitable, safe, maintained and used by trained people. Regulation 6 requires inspection where safety depends on the installation or the conditions of use.

How often should a PUWER inspection be carried out?

There is no fixed interval. Frequency follows risk, use and the manufacturer’s guidance — annual is common for general workshop machinery, six-monthly or shorter for high-risk or heavily used plant. What matters is that the interval is documented and defensible.

What is the difference between PUWER and LOLER?

PUWER covers all work equipment; LOLER adds specific duties for equipment that lifts. Lifting equipment has to satisfy both — which is why having one competent person cover both saves a second visit and a second set of paperwork.

Does second-hand machinery need a PUWER inspection?

Yes, and it is the most common reason for one. Second-hand and imported machines regularly arrive with guards missing, interlocks defeated or non-compliant controls, and the duty to put that right sits with you as the user, not the seller.

Where we work

PUWER inspections across Nottingham and the wider East Midlands — Derby, Leicester, Mansfield, Lincoln, Chesterfield, Loughborough, Newark and Worksop. See all areas covered.

Nottingham · Derby · Leicester · Mansfield · Lincoln

Book an inspection or ask a question

Quotes answered within 24 hours. Same-week and emergency attendance available where equipment is out of service.

Call now Request a quote